Quality Assurance  
     
 
Fundamental prerequisite for the manufacture of vessels which are subject to acceptance is the HPO and EN 729 / TRD (Technical Regulations for Steam Boilers) 201 approval.
This also includes the welding tests and procedure qualification tests which are constantly monitored by the TÜV authority.
Prior to commencing the production sequence, several operational steps must be observed. These include:

  • dimensioning of the components with modern design programmes
  • drawings made under application of the latest CAD systems
  • compilation of the piece lists
  • definition of the internal as well as external examination steps
  • preliminary checks by the respective approval agent
  • selection of the suppliers

  • Heliumprüfung von einem liegendem Kerosinbehäter -1 bar / 10 bar




     
         
         